PROJECT EXPERIENCE ENVIRONMENTAL ENGINEERING
Completed.
Engineering Design Review and Construction Supervision of Waste Management Facility at Agona East District (Agona Kwanyako), North Tongu (Battor) and Ada West (Ada).
This solid waste management facilities project involved conceptual and detailed design review of sanitary landfill site, office buildings, security post, barbed wire fence and access roads to the sanitary landfill. Activities undertaken include topographical survey, detailed design, cost estimates of works. Client name, Waste Landfill Co. Ltd.

Completed.
Engineering Design and Construction Supervision of Landfill Site in the Birim North District Assembly (BNDA). This sanitation and community waste management project involved feasibility study, conceptual and detailed engineering designs of sanitary landfill site, access and internal roads and storm drains. Activities undertaken included topographic survey, geotechnical investigations, hydrological & hydraulic studies, environmental and social impact assessment, detailed designs and cost estimation of works. Client name, Newmont Ghana.
Completed.
Engineering Design and Construction Supervision of Landfill Facility at Accra Compost and Recycling Plant. This project involves earthworks, construction of bunds and berms, laying of clay liner, leachate pipes, drainage layer, and gabion gas vents. Client Accra Compost and Recycling Plant (Subsidiary of Zoomlion).

Completed.
Engineering Design and Construction Supervision of 1No. 10-Seater WC. Public Toilet (Pilot Project) at Nyameani, in the Bosomtwi District of the Ashanti Region. Client name, Nyameani Unit Committee. Funded by World Toilet Association (WTA).

Completed.
Preparation of Detailed Engineering Designs and Bid Documents for Community Infrastructure Upgrading in Tamale. This project involves the design for the upgrading of roads, water supply, sanitary facilities (toilets and solid waste facilities), drainage structures, street and security lights; preparation of tender documents and evaluation. Client name, Tamale Metropolitan Assembly under the Second Urban Environmental Sanitation Project.

Completed.
Operation and Maintenance of Kumasi Landfill and Septage Treatment Facility at Dompoase, Kumasi-Ashanti Region. This project involves weighing of solid and liquid wastes delivered to the site, dumping/spreading/compaction/ covering of solid waste in landfill cells, discharge of septic waste (liquid) into ponds and general maintenance of the site (i.e. Controlling vegetation, maintaining roads and building structures). Client name, J. Stanley Owusu Group of Companies.

Completed.
Design and Tender Documents, Tendering and Construction Supervision for the Rehabilitation of 2No. Dugouts at Tacheku and Kwame Nansoni in the Chereponi District in the Northern Region of Ghana. This project involved topographical survey, geotechnical investigations, detailed design, preparation of Bill of Quantities and Tender Documents, Tendering, procurement of works and construction supervision. Client name Saboba/Chereponi District Assembly, Saboba.